Once open, Mosaic Companies’ new distribution hub will be fully integrated with the company’s logistics network and help the organization streamline business on both the East and West coasts.
Effectively installing the proper slope to drain as well as meeting the flatness requirement of the ANSI standard is challenging. Here, CTEF’s Scott Carothers walks us through the steps required to successfully install tile to achieve both.
For achievement of the WELL Health-Safety Rating, Florim USA implemented a range of internal protocols and measures such as extra surface cleaning, masking policies at least in accordance with local requirements, remote work policies and a staged return to the office.
The innovative façade, developed in collaboration with Italian architectural surfaces manufacturer Fiandre, memorializes victims of the 1915 Armenian genocide.