Most installers know the steps involved in stretching in carpet, but it’s easy to get wrong, resulting in costly rework or damage to a flooring contractor’s reputation.
As installers approach a floor tile job, there are numerous questions that need to be answered before the first tile is set. Is the floor substrate suitable for receiving tile and is it flat?
Wagner Meters’ Jason Spangler walks you through why moisture testing matters, the types of tests, a moisture meter’s role and what to look for when choosing one.
Performing a bond test prior to the installation of resilient floor covering is a great way to ensure that you are using the correct adhesive with the correct product and that both will adhere to the subfloor.
These three pro installers share a few of their tips and tricks to fill knowledge gaps, help you with your workflow and bring awareness to things you may take for granted.
In this month's Tile Tip, Scott explains how to save time and money installing GPTP over existing tile through the use of new tile technology and proper installation methods.