Week nine marks the second week of ceramic tile installation education. The students are permanently laying tile in their workspaces and wrapping up the final week of hands-on training.
In week six of the FCEF installer program, the students switch gears to hardwood flooring installation led by Lenny Hall, a regional instructor for the NWFA.
At the halfway point in the FCEF installation program, the students are now learning to install carpet on stairs where they are challenged and pushed outside of their comfort zones.
The students participating in the FCEF 10-week installation program worked with sheet goods in week three. With the help of some donations from Congoleum, they installed their first sheet vinyl floor.